亚洲男女内射在线播放,狂野黑人性猛交xxxxxx,我要看曰批全过程免费,91人妻人人澡人人爽人人精品,欧美最大胆的西西人体44,国自产拍偷拍福利精品免费一,欧美国产日本高清不卡,久久国产精品_国产精品,99热国产免费,99久RE热视频这里只有精品6

  • <ul id="6q2ga"></ul>
    AC source power & DC source power manufacturing factory

    Calculating method of alarm current

    As we all know, the capacity selection of AC power supply equipment is very important.choosing the right AC power supply is very important for production, manufacturing, testing and R&D!

    excessive capacity selection will increase unnecessary property investment; too small capacity selection will affect the normal production, testing and R&D process and even lead to unusable.

    therefore, mastering and understanding the calculation of alarm current will clearly know how to choose the capacity of AC power supply equipment. Suitable power supply equipment will make people feel like a tiger!

    AC power supply is divided into single-phase power supply and three-phase power supply according to the different output power.therefore, the calculation method of alarm current can also be divided into two kinds: single-phase power supply and three-phase power supply.
    the following are introduced separately:

    One:Single-phase power supply
    Output 0-300V: divided into low and high gear.the alarm current of low-voltage gear is 120 V, and that of high-voltage gear is 240V. capacity (VA)/gear voltage (V)=gear alarm current (A).

    Take 5KVA power supply as an example: 5000VA (capacity)/120V (low grade)≈42A; 5000VA/240V (high grade)≈21A.so we get the alarm current: the output of 5KVA power supply is in the range of 0 -150V, the maximum alarm (limit) current is 42A; the output of 5KVA power supply is in the range of 0 -300V, and the maximum alarm (limit) current is 21A.

    Output 0-600V, low-grade 240V, high-grade 480V, the same method to get the alarm current of 21/10.5A.
    The simple method is that we only need to calculate the low-grade or high-grade alarm current. Another kind of alarm current can be obtained immediately according to the low-grade alarm current = 2 times the high-grade alarm current

    Two: Three-phase power supply
    The alarm current is a single-phase alarm current, so the three-phase power supply needs capacity/3 to get the single-phase capacity, and then according to the calculation method of the alarm current of the single-phase power supply, the alarm current of the three-phase power supply can be obtained.

    Take three-phase 15KVA power supply as an example: 15KVA/3 = 5KVA, 5000VA/120V≈42A (low-grade alarm current), 42A/2 ≈21A (high-grade alarm current).therefore, the alarm current of three-phase 15KVA power supply is 42/21A.

    It is not difficult to find that the calculation of alarm current focuses on the unit of capacity is VA, the unit of voltage is V, and the unit of alarm current is A. Therefore, if the known unit of capacity is KVA, the unit of KVA should be converted to VA when calculating the alarm current. 1KVA is 1000VA.
    Recommend Products
    Online service
    Service Hotline
    86-769-89616802
    86-13602353727

    ADMIRE POWER
    新版天堂资源中文8在线| 无码中文精品专区一区二区 | 少妇无码一区二区三区免费| 天天摸天天做天天爽天天弄| 中文字幕无码精品三级在线电影 | 久久精品91| 亚洲日韩乱码中文无码蜜桃| 日韩精品一区二区三区在线观看人| 中文字幕乱码亚洲无线码| 国产婷婷色一区二区三区在线| 久久国产热精品波多野结衣av| 最近中文字幕的在线mv| 国产原创一区| 亚洲人色婷婷成人网站在线观看| 亚洲精品成人一二三区无码| 国产激情怍爱视频在线观看| 夫妇交换聚会群4P疯狂大战| 亚洲AV无码无在线观看红杏| 国产精品亚洲片夜色在线| 国产精品美女久久久久久| 人人狠狠综合久久亚洲| 99精品国产丝袜在线拍国语| 男女下面一进一出免费视频网站| 中文www新版资源在线| 性色av无码久久一区二区三区 | 天天成人综合网| 自拍偷拍二区| 亚洲婷婷五月综合狠狠爱| 亚洲精品成人AV在线播放| 午夜福利AV无码一区二区| 亚洲午夜无码久久久久| 中文文字幕文字幕亚洲色 | 国产丝袜视频一区二区三区| 国产成人av三级在线观看按摩| 国产乱来视频| 中文在线日本免费永久18近| 深夜影院深a久久| 国产美足白丝榨精在线观看SM| 亚洲日本乱码在线观看| 麻豆乱码国产一区二区三区| 少妇饥渴偷公乱a级无码|